“DriveStone installed the Stone Binder system to our driveway and pathway. It has bought new life and value to our property”

“My children were constantly suffering from sore falls and splinters caused by the bark chip under our swing set. Since I had DriveStone Rubber Bark system installed, there are no more painful bumps and splinters”

Rubber Top

Specifications

Curing Time
This product will normally cure overnight at 15 °C to accept light foot traffic the next day. Full wear resistance is achieved over 7 days (at a minimum constant temp of 15 °C). Water should not be allowed to lie on the surface for at least 7 days.

Rubber Top Make Up

stone slab rubber top make up
1. Sub Base

2. Black Rubber Granules

3. Top Layer of Fine Coloured Rubber Granules

4. Base Layer Varies in Depth Depending on Critical Fall Heights Required