Specifications
Curing Time
This product will normally cure overnight at 15 °C to accept light foot traffic the next day. Full wear resistance is achieved over 7 days (at a minimum constant temp of
15 °C). Water should not be allowed to lie on the surface for at least 7 days.
Rubber Top Make Up
2. Black Rubber Granules
3. Top Layer of Fine Coloured Rubber Granules
4. Base Layer Varies in Depth Depending on Critical Fall Heights Required